COMPLETIONS

WORKOVERS

ABANDONMENTS

  • Plug milling

  • Screen out recovery

  • Toe prep’s

  • DFIT’S

  • Fishing

  • Abrasive jetting

  • Production tubing clean-outs

  • Work-over and well servicing

  • Production testing services

  • Hydraulic fracturing flowback

  • Liquified petroleum gas frac flowback services

  • Inline testing services

  • Multi-stage sour flowback and well control

  • Pressurized tank storage

  • Well control

  • Live well data feed capable (SCADA)

  • Well data validation or submission

  • Detailed process and instrumentation diagrams for customer specific projects

  • Water transfer

  • Off site well monitoring

  • Treater watch

  • Gate guard services

  • Sand management

PRODUCTION TESTING - FLOWBACK

Guage%20Icon_edited.png
  • Dual Barrel Debris Catchers

    • 3" 10,000 psi dual barrel debris catchers in both vertical and horizontal
       

  • Double Drop Manifolds

    • The dual stage pressure reduction minimizes wash-outs and erosion
       

  • High Temperature Vessels

    • High temperature rating on vessels from 130 degrees to 300 degrees Fahrenheit
       

  • Heated Housed Work Facility

    • Warm and comfortable working environment for field staff and customers
       

PRODUCTION TESTING - FLOWBACK FLEET

  • Drill Out Flowline

    • All drill-out packages come with 3" 1502 10,000 psi flowline

  • Inline Kits

    • Inline valve set up pre-fabricated inside separator buildings

  • Flowback Separators

    • 3 & 4 phase units available with high level/high pressure shutdowns and

    • Temperature ratings of 130 F* to 300 F*.

    • Our fleet of flowback tanks range from 4m3 to 24m3 bbls capacities and are rated from 200 psi - 2000 psi

  • Low Stage – Storage Tanks

    • Low stage tanks help to increase retention time and allow for better separation during drill-out and flowback operations

    • 125 psi – 200psi x 60m3
       

  • Sand Separators

    • We carry cyclonic vertical sand traps in 5,800 psi and 10,000 psi and spherical sand traps in 5,000 psi

  • Emergency Shutdown Systems

    • 2" or 3" 10,000 psi  Units come with an operator panel and quick exhaust valves

    • 3” 15,000 psi with Adjustable choke

  • Frac Support Trailers

    • Frac support trailers are 2" and 3" 1502 10,000 psi with a mounted manifold and flowline
       

  • Pipeline Support Skids and Trailers

    • Trailers have 200-300 feet of 3" 1502 pipe and air compressors to help reduce the venting of combustible gases
       

  • Flowline Restraints

    • Nylon restraint systems that are recognized in the industry as the best of any other flowline restraint system
       

  • Multi-Well Manifolds

    • 3" 10,000 psi multi-well manifolds that can accommodate up to 14 wells during a multi well completion
       

  • Office Trailer

    • 24' custom office trailers complete with all required safety equipment and computer equipment
       

  • Flare Stacks

    • Trailer mounted 6" X 60' portable units or freestanding up to 120’

PRODUCTION TESTING - SANDX

  • Environmentally friendly and cost saving sand disposal
     

  • Separates Oil & Water in order to efficiently remove processed sand
     

  • Enables operators to recirculate drilling fluids from SandX tank, saving on disposal, chemical and cleanout costs
     

  • Reduces economic and ecologic impact of sand disposal
     

  • Produces “dry” sand = cost effective disposal