








COMPLETIONS
WORKOVERS
ABANDONMENTS
-
Plug milling
-
Screen out recovery
-
Toe prep’s
-
DFIT’S
-
Fishing
-
Abrasive jetting
-
Production tubing clean-outs
-
Work-over and well servicing
-
Production testing services
-
Hydraulic fracturing flowback
-
Liquified petroleum gas frac flowback services
-
Inline testing services
-
Multi-stage sour flowback and well control
-
Pressurized tank storage
-
Well control
-
Live well data feed capable (SCADA)
-
Well data validation or submission
-
Detailed process and instrumentation diagrams for customer specific projects
-
Water transfer
-
Off site well monitoring
-
Treater watch
-
Gate guard services
-
Sand management
PRODUCTION TESTING - FLOWBACK

-
Dual Barrel Debris Catchers
-
3" 10,000 psi dual barrel debris catchers in both vertical and horizontal
-
-
Double Drop Manifolds
-
The dual stage pressure reduction minimizes wash-outs and erosion
-
-
High Temperature Vessels
-
High temperature rating on vessels from 130 degrees to 300 degrees Fahrenheit
-
-
Heated Housed Work Facility
-
Warm and comfortable working environment for field staff and customers
-
PRODUCTION TESTING - FLOWBACK FLEET
-
Drill Out Flowline
-
All drill-out packages come with 3" 1502 10,000 psi flowline
-
-
Inline Kits
-
Inline valve set up pre-fabricated inside separator buildings
-
-
Flowback Separators
-
3 & 4 phase units available with high level/high pressure shutdowns and
-
Temperature ratings of 130 F* to 300 F*.
-
Our fleet of flowback tanks range from 4m3 to 24m3 bbls capacities and are rated from 200 psi - 2000 psi
-
-
Low Stage – Storage Tanks
-
Low stage tanks help to increase retention time and allow for better separation during drill-out and flowback operations
-
125 psi – 200psi x 60m3
-
-
Sand Separators
-
We carry cyclonic vertical sand traps in 5,800 psi and 10,000 psi and spherical sand traps in 5,000 psi
-
-
Emergency Shutdown Systems
-
2" or 3" 10,000 psi Units come with an operator panel and quick exhaust valves
-
3” 15,000 psi with Adjustable choke
-
-
Frac Support Trailers
-
Frac support trailers are 2" and 3" 1502 10,000 psi with a mounted manifold and flowline
-
-
Pipeline Support Skids and Trailers
-
Trailers have 200-300 feet of 3" 1502 pipe and air compressors to help reduce the venting of combustible gases
-
-
Flowline Restraints
-
Nylon restraint systems that are recognized in the industry as the best of any other flowline restraint system
-
-
Multi-Well Manifolds
-
3" 10,000 psi multi-well manifolds that can accommodate up to 14 wells during a multi well completion
-
-
Office Trailer
-
24' custom office trailers complete with all required safety equipment and computer equipment
-
-
Flare Stacks
-
Trailer mounted 6" X 60' portable units or freestanding up to 120’
-
PRODUCTION TESTING - SANDX
-
Environmentally friendly and cost saving sand disposal
-
Separates Oil & Water in order to efficiently remove processed sand
-
Enables operators to recirculate drilling fluids from SandX tank, saving on disposal, chemical and cleanout costs
-
Reduces economic and ecologic impact of sand disposal
-
Produces “dry” sand = cost effective disposal