COMPLETIONS
WORKOVERS
ABANDONMENTS
-
Plug milling
-
HZ Coil Frac
-
Toe prep’s
-
DFIT’s
-
WellBore Cleanouts
-
Abrasive jetting
-
Work-over and well servicing
-
N2 Fluid Pumping Services
-
N2 bulker transportation
-
Fishing
-
Production Tubing Cleanouts
-
Fluid Rheology
COILED TUBING - FLEET
-
Fleet consists of 6 Coil Tubing units:
-
3 Large Conventional CTU with up to 23,000ft (7000m) of 2-3/8” CT Capacity
-
2 Intermediate Conventional CTU with up to 16,000ft (4900m) of 1 ¼’’ - 2’’ CT Capacity
-
1 shallow body job Coiled Tubing Unit
-
-
Unit compatible Multi-Reel with up to 25,000ft (7600m) of 2-3/8’’ CT Pipe
-
Reel trailer
-
-
Injectors:
-
1 x 130,000 lbs CT Injectors
-
3 x 100,000 lbs CT Injectors
-
1 x 80,000 lbs CT Injectors
-
COILED TUBING – FLUID PUMPING – N2

-
1 Conventional Horsepower Frac Pumps (15,000 psi rated)
-
4 High Pressure Twin Pumping Units (15,000 psi rated)
-
2 pumps equipped with heated chem injection systems
-
3 Nitrogen Pumping Units
-
1 Nitrogen Bulker Unit
COILED TUBING – FLUID PUMPING – N2
Fluid Rheology Control System (FRCS)
ADVANTAGES
-
Provides fluid filtration system
-
Reduces chemical consumption
-
Fluid rheology quality control
-
Calculate Reynold’s number, ensuring turbulent flow, resulting in greater cleaning efficiencies
-
Minimize stuck hole incidents
-
Eliminates short trips during cleanout and milling operations
COILED TUBING – FLUID PUMPING – N2
Fluid Rheology Control System (FRCS)
-
Enclosed/heated chemical storage
-
6 * 330 gal (1.25m3) Chemical Totes
-
6 high precision electric screw pumps with VFD controllers (variable frequency drive)
-
In-line flow meter
-
Programmable pump controllers capable of auto-dosing for optimal chemical dosing consistency
-
Fluid Filtration system x 2
-
Self enclosed power pack
-
Accurate viscosity measuring tools
-
Trained fluid technicians
-
Compatible with a Fracturing Horsepower